July 28, 2010

38th Week Handover Next Week

It has finally come, Handover 2/8/10, we are finally getting the keys to our new home, 9mths in the making.


Both parties have come up with a mutual agreement on all issues regarding our build.

My partner and I are both very excited and we have both gone into over drive mode in chasing up all works which are going to be done after handover.

July 14, 2010

37th Week Progress

After our first inspection we gave a copy of the report to the builder so he could fix all the defects found.

We had our second inspection last Wednesday and without surprise, there were still outstanding defects still needing to be fixed from our inspector’s first inspection report.

This is what really upset my partner and me; it took nearly a month after the first PCI to hear back from the builder to say that all defects on the report are now fixed. Does he think we are stupid, we could clearly tell that nothing was done on the outside of the house and he insisted that everything possible was done and it was time to do handover. This was the reason why we had to get our inspector in to do a follow-up inspection.

After our second PCI, we gave another copy of the report to our SS and this time a copy to his manager and our CSO, so they can see where we are coming from and the reason why we are not settling.

I went passed the house yesterday and saw progress, the patches of mortar which stood out from the road, had been blended in and not as noticeable.

The bricks at the front of the house still have water stains on them and they need to be fixed before handover. If they are not I will only do handover with the General Manager on site and if he/she would accepts that the status of my house is at a display house quality? Only then I’ll settle and with a letter from our solicitor.

I might be harsh but we have given the builder all the time in the world, without harassing them to build the house, now 37 weeks later and still haven’t got handover.

We saw the builders display house and all we want is a house good enough to be like a display house, is that really too much to ask??

July 6, 2010

36th Week Finally Second PCI inspection

Metricon expect us to just handover final payment because on their system the house is complete, this shows they have a lack of communication amongst themselves as I informed my SS last week that we are not happy with the bricks and not to ask for handover or issue final invoice until defects are fixed.


Since this conversation with our SS, Metricon has now sent a us two invoices one last week that afternoon after I spoken to my SS and another this week asking for final payment and saying we have no right to be holding payment as house is complete, this is without us having a second inspection to see if all defects have been rectified.

Finally we are having our second inspection 36 days after the first PCI.

We’ve had to get our independent inspector in to do a follow-up inspection as we feel the builder hasn’t completed all points from our inspectors’ first inspection report, with the most noticeable defects are the bricks and also to check if all the defects we marked with red dots have been fixed.

I have no problem with giving the builder there money, but it looks like they have a problem with fixing our house. We want our house, but only when all defects are fixed, surely this isn't to much to ask for.

June 16, 2010

33rd Week Spotted a Desgin Fault

This is what I would call a design fault as the gutter system is clearly defective with the facade.

How will the builder fix this problem so the water does not overflow down the bricks and do more damage.
I emailed this picture to my SS and I hope he can come up with a solution that will fix this problem.

Compensation or Rendering or Stackstone won't stop the water from running down the bricks. This will have to be fixed before handover.


Posted by Picasa

June 1, 2010

31st Week PCI inspection

We had our inspection today 1/6 @ 11am and it looks like the inside of the house has the chickenpox, there are red dots everywhere, in every room and wall.

My partner and I combed every centermeter of every wall, it took just under 3hrs to inspect the inside.
We almost went through 2 rolls of red dots, with our SS calling me hawk eye as I was finding all these small things which you really had to look for and also found a few things questionable. It pays to read other peoples posts on building fourms and blogs.

We also had our own independant inspector as well and he inspected the outside and also the inside of the house. I recommend people to get themselves a inspector at least for the final inspection, it's money well spent and it gives you the peace of mind.

There are quite a few things which the builder has to fix from what I could gather after a short chat with our inspector, as he found quite a few minor things but we just have to wait for his report, which our SS will get a copy of.
With all these errors, who knows when handover will be, it mostly cosmetic.

We took plenty of pictures today nearly every room.

Enjoy the pictures!!!







Posted by Picasa

31st Week PCI inspection



Posted by Picasa