January 20, 2011

Backyard Update

Didn't realise how messy laying turf can be espcially when it starts raining, took longer to clean the mess then to lay the turf.
End result, Love It!!!

7 cubic meters of top soil

80 sq meters of Sir Walters Soft Leave Baffalo Turf




Half Black Concrete along the side of the house.
Posted by Picasa

January 19, 2011

170 days after handover; Driveway

We had the driveway done just a few days before Xmas, it was the last bit concrete which needed to be done. We intentionally made sure it was one of the last building jobs to be completed.

My partner and I created the mix as we didn't like any other exposed concrete we saw from Concrete supplier in SE Melbourne.
So the lovely people at Vic Mix made a concrete mix to our specifications and named it. Wasn't cheap even at trade price, but we love the outcome and effect.

The photos do not give a true indication on how the driveway looks due to the sun.


Posted by Picasa

November 15, 2010

Backyard Pic


Entertainment area and Alfresco area still to be tiled


Propose garden bed along the fence and house with grass in the middle

This area is always wet and muddy so we are just going to
concrete this whole side.
Posted by Picasa

Internal Pics


Feature wall in the master bedroom. Paint colour 'Colorbond Ironstone'.


WIR


Feature wall in the family room, entertainment area. Paint colour 'Laminex Fossil'.
This feature wall is the same colour as the kitchen cupboards.


Laundry Cupboard
Posted by Picasa

55th Week More Progress


What a big diffrence Render makes to a house, love the new look!!!


Milan Black Tiles 600 x 600

Posted by Picasa

October 19, 2010

51st Week Getting There!!!

It’s been awhile since my last post, but there has been a fair bit of progress, it’s coming along nicely, the only annoying thing is when tradies chip or scratch something and don’t have the decency to tell you.

We’ve managed to concrete the alfresco area and add on outside entertainment area.

Laundry cupboard installed and the plumbing and tile splash back finally completed.

WIR installed and all holes and plaster damaged fixed, just need to do some sanding and a nice fresh coat of paint and then it’s all complete.

The front facade is now all rendered and what a big difference render makes, the house looks amazing and a different house all together.

Our electrician finally came over on the weekend and installed all extra power points and all the internal lighting and flood lights.

Portico is all tiled, which means we can make a start on the driveway, as the tiles will sit flush with the concrete. We’re off today to have a look at what colour and style of exposed aggregate we want for a driveway. We also have to change the design of the driveway as I noticed yesterday when I parked in the proposed driveway it wasn’t wide enough for two cars to park.

Still waiting for the Bonaire add-on inverter Air Con to be released onto the market so it can be installed. I was told is was going to be released at the start of October, so I rang the supplier last week and they don't even know when it will be released, Not Happy. Tiles should of arrived this week, but there was a 2 week shipping delay, so fingers crossed by the end of the month, once I get the confirmation that they have arrived we’ll book in our tiler. Driveway, Front garden, Back yard, Carpet, Curtains, Feature walls and anything else that has skipped my mind, still to be done.

Will post pictures soon I promise!